Jump to content

Type XXIII submarine

From Wikipedia, the free encyclopedia
Rendering of a Type XXIII submarine
Class overview
Builders
Operators
Preceded by
Succeeded byType 201 coastal submarine
Built1944–1945
In commission1944–1968
Planned980 [1]
Completed61
Lost7
General characteristics
TypeCoastal submarine
Displacement
  • 234 t (258 short tons) surfaced
  • 258 t (284 short tons) submerged
Length34.68 m (113 ft 9+12 in)
Beam3.02 m (9 ft 11 in)
Draft3.66 m (12 ft 0 in)
Propulsion
  • 1 × MWM RS134S 6-cylinder diesel engine, 575–630 metric horsepower (423–463 kW; 567–621 shp)
  • 1 × AEG GU4463-8 double-acting electric motor, 580 metric horsepower (427 kW; 572 shp)
  • 1 × BBC CCR188 electric creeping motor, 35 metric horsepower (26 kW; 35 shp)
Speed
  • 9.7 kn (18.0 km/h) surfaced
  • 12.5 kn (23 km/h) submerged
Range
  • 2,600 nmi (4,800 km) at 8 kn (15 km/h) surfaced
  • 194 nmi (359 km) at 4 kn (7 km/h) submerged
Test depth180 m (590 ft)
Complement14–18
Armament

German Type XXIII submarines were the first so-called elektroboote ("electric boats") to become operational. They were small coastal submarines designed to operate in the shallow waters of the North Sea, Black Sea and Mediterranean Sea, where larger Type XXI electric boats were at risk in World War II. They were so small they could carry only two torpedoes, which had to be loaded externally. As with their far larger sisters—the Type XXI—they were able to remain submerged almost all of the time and were faster than conventional U-boats, due to the improved streamlining of their shape, batteries with larger capacity and the snorkel, which allowed the diesel engines to be used while submerged. The Type XXI and XXIII U-boats revolutionized post-war submarine design. Nearly a thousand Type XXIII boats were projected towards the close of World War II, but most of these were either cancelled, scrapped incomplete, or only projected.[1]

Background

[edit]

When development began on the Type XXI U-boat in late 1942, it was proposed to simultaneously develop a smaller version incorporating the same advanced technology to replace the Type II coastal submarine. Admiral Karl Dönitz added two requirements: as the boat would have to operate in the Mediterranean and the Black Sea, it had to be able to be transported by rail, and it had to use the standard 53.3 cm (21 in) torpedo tubes.

The development of the Type XXIII was given a high priority, with an emphasis on using existing components as much as possible. To reduce development time, Hellmuth Walter designed the new submarine based on the previous Type XXII prototype. By 30 June 1943 the design was ready and construction began in parallel at several shipyards in Germany, France, Italy and Ukraine. The lead contractor was Deutsche Werft in Hamburg.

As with the Type XXI, the Type XXIII was intended to be constructed in sections, various modules being produced by different subcontractors. Some were to be assembled at foreign yards, including U-2446 through U-2460 at the Deutsche Werft yard at Nikolaev, Southern Ukraine. These were reassigned to the Linzner yard on 1 May 1944 and subsequently cancelled.[2] In the end, circumstances meant that construction was concentrated at Germaniawerft in Kiel and Deutsche Werft in Hamburg, Germaniawerft building 51 and Deutsche Werft 49. Of the 280 submarines ordered, only 61 entered service, and only 6 ever carried out a war patrol.

Description

[edit]

The Type XXIII had an all-welded single hull, the first submarine to use such a design. It had a fully streamlined outer casing and apart from the relatively small conning tower and a fairing which housed the diesel exhaust silencer, it had an uncluttered upper deck. In line with Walter's design practice, there were no forward hydroplanes, although these were added later.

The submarine was propelled by a single three-bladed propeller and steered by a single rudder. As with the Type XXI, the lower section of the figure-of-eight hull was used to house a large 62-cell battery.[3]

In order to allow the boat to be transported by rail, the hull sections had to be limited in size to fit the standard loading gauge. For transportation, the hull was broken into four sections and the bridge was removed. Due to the space restrictions, the forward bow section had to be made as short as possible, which meant that only two torpedo tubes could be fitted and no reload torpedoes could be carried. The torpedoes were loaded by ballasting the submarine down at the stern so that the bow lifted clear of the water and the torpedoes could be loaded directly into their tubes from a barge.[4] The Type XXIII proved to have excellent handling characteristics, and was highly maneuverable both on the surface and underwater. Its crash dive time was 9 seconds, and its maximum diving depth was 180 metres (98 fathoms). Submerged, its speed was 12+12 kn (23 km/h), and while surfaced its speed was 9 kn (17 km/h). A submerged speed of 10+12 kn (19 km/h) could be attained while snorkeling.[5]

Construction

[edit]

The first forty-nine boats (U-2321 to U-2331, and U-2334 to U-2371) were ordered from Deutsche Werft, Hamburg, while two (U-2332 and U-2333) were ordered from Friedrich Krupp Germaniawerft's yard at Kiel. Twenty-nine further boats (U-2372 to U-2400) were ordered from Deutsche Werft's wartime occupied yards at Toulon, but the first nine of these were scrapped incomplete on the stocks and the remainder never commenced.

Another sixty were ordered to be built by the company at other yards in occupied nations - thirty at Genoa (U-2401 to U-2430), fifteen at Monfalcone (U-2431 to U-2445) and another fifteen at Nikolaev and Linz (U-2446 to U-2460), where a further forty (U-2461 to U-2500) were projected but never ordered. All of these were cancelled and never commenced.

Eight hundred additional units were intended to be built by Deutsche Werft - five hundred at Hamburg (U-4001 to U-4500), of which the first 120 were ordered and started were subsequently scrapped incomplete, with the others cancelled and never begun; and three hundred at Kiel (U-4701 to U-5000), where eleven (U-4701 to U-4712, exclude U-4708) were actually built (orders for U-4713 to U-4891 were cancelled, while U-4892 to U-5000 were projected only).